Mulberry at Park Heights-Phase 1 and 2
Client : M/s Emaar Properties PJSC
Consultant : M/s Brewer Smith Brewer Gulf (BSBG)
Main Contractor : M/s Engineering Contracting Co. L.L.C
Phase (1) 4 Bldg. (1 common Basement + G + 7 floors)
Phase (2) 4 Bldg. (1 common Basement + G + 7 floors)
located at Mohammed Bin Rashid City Dubai-UAE.
COMPLETE ELECTROMECHANICAL SERVICES
Built up area: 186,000 m
8 nos. of Transformer with a Total Connected Load of 11,000 KW
4 nos. of Standby Generator with 800 kva capacity each
Fully Integrated Fire Alarm System with 10 panels, Emergency and Exit Light System with 8 panels and BMS
Low Current System such as Access Control System, CCTV System, Audio Intercom System, and Lighting Control System
GSM and Structured Cabling System
Lightning Protection and Earthing System
LPG System
Fire Fighting System consists of Sprinkler, Hose Reel (Cabinets) with 2 sets Fire Pump Set (1000GPM capacities), FM 200 System, and Generator Foam System
Plumbing System consists of Water Supply Piping with Sanitary Ware Installation, Booster Pump Set (8 nos.), GRP Water Tank (10 nos.), Hot Water System, Drainage System and Submersible Pumps
HVAC System consists of Heat Exchanger (5000 TR for PH 1 & PH 2 -16 nos.), VFD Secondary Chilled Water Pumps (8 sets) & Chemical Treatment System for all Chilled Water Network, FCU (2016 nos.), AHU (8 nos.) and FAHU with Heat Wheel Recovery System (16 nos.)
Ventilation System consists of FAHU with Ducting, Smoke Exhaust Fans and General Exhaust Fans
Basement Car Park Ventilation System
Picture Gallery
[ Click on image for bigger view ]
Back to clients...   
       Copyright 2014, United Masters Electromechanical L.L.C. All Rights Reserved.