Fit-out Works to Carrefour Hypermarket
Client : M/s Majid Al Futtaim-Hypermarket
Consultant : M/s Mehboob & Company Consulting Engineers
Main Contractor : M/s Engineering Contracting Co. LLC
GF MEP Services + Basement Mechanical Room Located at Burjuman Centre Dubai UAE
COMPLETE ELECTROMECHANICAL SERVICES
Built up area: 6300 mē
2 nos. of Sub Main Distribution Boards with a Total Connected Load of 1,330 KW
Fully Integrated Fire Alarm System with 1 panels & Central Battery System with 1 panel
Low Current Systems such as Anti-Theft System, BMS System, Access Control System, CCTV System, Intruder Alarm System, SMATV System and PA System
GSM and Structured Cabling System
Earthing System
Fire Fighting System consists of Sprinkler, Fire Hose Reel, FM 200 and Kichen Hood Fire suppression System
Plumbing System consists of Water Supply Piping with Sanitary Ware Installation, Booster Pumps, Water Treatment System and Drainage System
HVAC System consists of Chilled Water System, FCU (Ducted & Decorative) & Ducted DX units
Ventilation System consist of FAHU with Ducting; smoke exhaust fans; General exhaust fans; exhaust and fresh air for Kitchen Hoods
Back to projects...   
       Copyright 2014, United Masters Electromechanical L.L.C. All Rights Reserved.