Labour Accommodation
Client : M/s Jiwin Investment
Consultant : M/s LACASA
Main Contractor : M/s Engineering Contracting Company LLC.
(G+2) Labour Accommodation (18 Building) & Amenities Building.
COMPLETE MEP SERVICES
Built up Area 113,000 mē.
19 nos. of Transformers with total connected load of 16.7 mega watts.
Fully Integrated fire Alarm System.
Fully LPG System.
Lightning Protection & Earthing System.
Split Ducted System.
Direct expansion A/C Units had been utilized in the project (4,400) A/C Units (Packaged, Decorative, Ducted Concealed, Window) including Duct Wok Installation, Fresh Handling Units & Control System. Sprinkler / Hydrant System.
Fire Fighting Protection System (Sprinkler & Hose reel Cabinets) FM 200 System, Pre-action System & Foam Generator System.
(4800 RT) District Cooling System including heal exchange, variable frequency secondary chilled Water Pumps, 1,400 Fan Coil Units & Fresh Handling Units, Chemical Treatment System for the chilled water network.
GRP Water tank, Transfer Pumps, Booster Pumps, Sanitary Wares & Accessories.