Refurbishment of Burjuman Centre
Client : M/s Burjuman L.L.C.
Consultant : M/s Hyder Consulting (ME) Ltd.
Main Contractor : M/s Engineering Contracting Co. L.L.C.
B+G+5F on Plot No. 317-983 Mankhool, Dubai UAE
COMPLETE ELECTROMECHANICAL SERVICES
Built up area: 95,810 mē
12 nos. of Transformer with a Total Connected Load of 13,000 KW
1 no. of Standby Generator with 1,000 kva capacity.
Fully Integrated Fire Alarm System, Emergency and Exit Light System with 3 panels and BMS.
Low Current Systems such as CCTV System, Lighting Control System, Access Control System & Audio Intercom System, People Counting System PABGM
GSM and Structured Cabling System
Lightning Protection and Earthing System
LPG System
Fire Fighting System consists of Sprinkler, Hose Reel (Cabinets) FM 200 System, Deluge and Generator Foam System
Plumbing System consists of Water Supply Piping with Sanitary Ware Installation, Transfer Pumps, Booster Pumps, Hot Water System and Drainage System
HVAC System consists of Centrifugal Chiller, Cooling Tower, Primary and Secondary Chilled Water Pumps, FCU (450 nos.), FAHU (21 nos.), AHU (10 nos.) and Chemical Treatments for Chilled Water Network.
Ventilation System consist of FAHU with Heat Recover, Smoke Exhaust fans & General Exhaust Fans, Make up Air Fans (5 nos.), Car Parking System with Jet Fans and Ecology Units (10 nos.) Extract Fans.