Arabian Ranches 2 Development
Client : M/s Emaar Properties PJSC
Consultant : M/s Al Gurg Consultants
Main Contractor : M/s Engineering Contracting Co. L.L.C.
Gr + 1 Retail Centre, Ground only Restaurant and Gr+1 Residential Club
on Plot no. 6655383 located at Wadi Al Safa 7 Dubai UAE
COMPLETE ELECTROMECHANICAL SERVICES
Built up area: Retail & Restaurant 9,380.57 m˛ / Resident’s Club 5,605.50 m˛
5 nos. of Transformer with a Total Connected Load of 5,342 KW
2 nos. of Standby Generator with 150 & 50 kva capacity
Fully Integrated Fire Alarm System, Emergency and Exit Light System with 3 panels and BMS
Low Current System, CCTV System, Lighting Control System and BGM System
GSM and Structured Cabling System
Lightning Protection and Earthing System
LPG System
Fire Fighting System consists of Sprinkler, Hose Reel (Cabinets) FM 200 System, Pre-action System and Generator Foam System
•Plumbing System consists of Water Supply Piping with Sanitary Ware Installation, Transfer Pumps, Booster Pumps, Hot Water System and Drainage System
HVAC System consists of Chiller Cooling System (848 RT), Variable Frequency, Primary and Secondary Chilled Water Pumps, FCU (34 nos.), FAHU and Chemical Treatment System for the Chilled Water Network.
Ventilation System consist of FAHU with Heat Recovery, Smoke Exhaust fans & General Exhaust Fans
Picture Gallery
[ Click on image for bigger view ]
Back to projects...   
       Copyright 2014, United Masters Electromechanical L.L.C. All Rights Reserved.