Mayfair Residency
Client : M/s Deyaar Development
Consultant : M/s AREX
Main Contractor : M/s Engineering Contracting Co. LLC
2B+G+3P+18 on Plot No. BB. A06.047
COMPLETE MEP SERVICES
Built up Area 71, 000 mē.
4 nos. of Transformer with total connected load of 3,411 kw.
2 nos. of Standby Generator with 450 kva capacity.
Fully Integrated Fire Alarm System (with 4 panels) & BMS.
Full Low Current System (Access Control System, CCTV System, Gate Barrier System, Audio Intercom System, Lighting Control System.
Central Battery System (with 6 panels).
Aircraft Warning Light System (medium Intensity).
GSM & Structured Cabling System.
Lightning Protection & Earthing System.
LPG System.
Fire Fighting Protection System (Sprinkler & Hose reel (Cabinets) FM 200 System, Pre-action System & Foam Generator System.
(4800 RT) District Cooling System including heat exchanger, variable frequency secondary Chilled Water Pumps, 1,400 Fan Coil Units & Fresh Handling Units, Chemical Treatment System for the chilled water network.
GRP Water Tank, Transfer Pumps, Booster Pumps, Sanitary Wares & Accessories.