Sky News Arabia
Client : M/s Two Four 54
Consultant : M/s Norr Group
Main Contractor : M/s Engineering Contracting Company LLC.
G+2 Additional Building & Modifications to existing Building
located at Abu Dhabi Media Campus, Abu Dhabi- UAE.
Sky News facility at Abu Dhabi Media Free zone main building contains Central apparatus room (CAR), UPS room, Media Room, NOC room, Edit Suits etc.
COMPLETE MEP SERVICES
Built up Area 2, 365 mē.
Replacement of existing TRM with QRM.
Supply and installation of 1500KVA transformer with LV and HV terminations in coordination with ADDC.
Supply and installation of 3 source MDB with PLC control - 3 sources 1. ADDC main 2. Stand by prime generator 3. Mobile generator connection provision.
1500 KVA prime rated generator in sound proof enclosure with day tank and separate bulk tank.
300KVA UPS system 2 nos with 2 battery bank in a parallel redundant configuration.
Lighting with dimming and studio lighting
Power and technical Earthing.
Lightning protection system.
Fire Alarm and Emergency lighting
Access Control and CCTV system.
Integrated BMS system.
Structured Cabling with cat-6A and single & multimode FO Cables and 10 nos of racks.
Air-conditioning with chilled water system for main building with 100TR chiller duty standby. CAR is equipped with CCUs (5 duty + 1 Standby) each 14TR, outside garage is equipped with VRV and vehicle smoke extract system.
Fire protection fully sprinklered CAR, LV, UPS rooms telephone room equipped with FM200 system.CAR is equipped with water leak detection system.Fuel Tank is protected by deluge sprinklers.
Drainage and Water supply system.
Picture Gallery
[ Click on image for bigger view ]
Back to projects...   
       Copyright 2014, United Masters Electromechanical L.L.C. All Rights Reserved.