Emirates Flight Catering
Client : M/s Emirates Flight Catering LLC.
Consultant : M/s Artec
Main Contractor : M/s Engineering Contracting Company LLC.
For Emirates Airlines at Dubai International Airpot Terminal-1
COMPLETE MEP SERVICES
Built Up Area 2,448 M.
Two nos. of 1500 KVA transformers feeding two nos. of 2500 A LVDB which is coupled through a 2500A motorized ACB.
Tapping of fire fighting system from 6" line in existing building with the options of dry type inside cold room through deluge value and compressors connected with wet system.
Interconnection of water supply from existing building to extension building under live condition.
Interconnection of Fire Alarm and Voice Evacuation system of extension building loop to the existing building and corresponding up gradation in Existing Fire Alarm panels.
FM 200 system for LV room.
Interconnection of drainage system with existing system.